Buildings
The frame going up on cleared ground and the finished roof over it. The girls’ dormitory and the school that replaced the one the earthquake took down.

Home / Photo album / The 2015 earthquake
Chyangba
April 2015. The walls of the school opened to the roof and families slept outdoors. The last three are the architect’s drawings for the building that replaced it.
1 / 12
The two storey school building with its stone wall collapsed after the second quake.
The frame going up on cleared ground and the finished roof over it. The girls’ dormitory and the school that replaced the one the earthquake took down.
Lessons, the library and the uniform days. What every building in the village is for.
The 2018 team trekked to the village and on to Everest Base Camp.
Give
Teachers, uniforms, supplies and twenty made beds are what the money reaches once the tents come down.