Skip to content
2026 Nepal flood relief Emergency appeal. Any amount accepted. Donate now
Donate
The finished dormitory building below the school campus in Chyangba.

Home / Projects & Impact / The Chyangba Girls’ Dormitory

Solukhumbu, Nepal

The Chyangba Girls’ Dormitory

Finished in February 2026 and standing just below the school campus. Twenty girls who live too far to walk now sleep here for the ten month school year, at no cost to their families.

How it was built

The girls shared floor mattresses laid side by side in one room. There was no space to store anything, nowhere to study, and they ate in shifts because the room could not hold them all at once.

The new building gives each girl her own sleeping space, her own bed and bedding, and a shared dining area big enough for everyone. There is a study room, running water, and a set of donated computers.

Who runs it

Local partners in Chyangba Village, alongside the school. The dormitory is open for the ten month school year and costs the families nothing.

How it went up

1 / 7

The building plot levelled by hand on the hillside.

The ground levelled by hand

Twenty girls used to sleep on floor mattresses laid side by side and eat in shifts. Each of them now has a bed, and they sit down to dinner together.

More in Chyangba

The earthquake resistant school with its blue roof and prayer flags.

Solukhumbu, Nepal

Wongchu Biswa Darshan School

Rebuilt with the Nepali Relief Fund of Indiana and an architect from Kathmandu after the April 2015 quake, on an initiative of Pemba Dorjee Sherpa .

Read the story

A two storey stone building with blue window frames and a long green roofed block on a ridge above forested hills, with snow peaks on the horizon.

Chyangba, 2015

Smokeless stoves

Stoves carried up by truck and on foot and installed in the village kitchens, and the dedication of the two storey school buildings.

Read the story

The two storey schoolhouse with its stone wall brought down by the April 2015 earthquake.

Chyangba, 2014

The school the quake took down

The schoolhouse built the year before the April 2015 earthquake destroyed it, and the reason the village rebuilt to withstand the next one.

Read the story

See all projects

Children dancing in a line in the school yard with their arms out, in padded jackets and uniforms.

Give

The village, not just the school

Everything Education Elevated builds in Chyangba is funded by the people who climb for it.